Continued, ongoing and continuous process verification are three phrases for two different things.
Continued process verification is the FDA's name for Stage 3 of process validation. The 2011 guidance defines it as assuring that during routine production the process remains in a state of control.
EU GMP Annex 15 (2015) describes the same activity and calls it ongoing process verification. Its glossary adds "also known as continued process verification", so those two are one.
Continuous process verification is the other thing. ICH Q8(R2) defines it as an alternative approach to process validation in which manufacturing process performance is continuously monitored and evaluated. Annex 15 (2015) says it can be used as an alternative to traditional process validation for products developed by a quality by design approach, where development has scientifically established that the control strategy gives a high degree of assurance of product quality. A site that makes three validation batches and then trends its data is doing the first thing, not this one.
Two of the three shorten to CPV, which is where reports go wrong. "CPV was applied" means a monitoring program to one reader and an alternative way of validating to another.
In a protocol or a report, write the phrase out once and cite the document it comes from.
Industries



