Skip to content

News

Why a FAT result is written as a number

  • News
  • 1 min read

A FAT sheet with "OK" in the result column tells the next reader someone was satisfied, and nothing about what they measured.

Excellence is one of our five values, and on a factory acceptance test it looks like a number.

Take the clean-filter pressure drop on an AHU. "OK" records a judgement. "118 Pa, acceptance ≤ 150 Pa", with the gauge ID and its calibration due date, records a measurement anyone can check again.

That line gets read at least three more times. The site engineer at IQ compares it with the installed unit and sees whether anything changed in transport. Maintenance uses it as the clean-filter baseline for the first filter change, instead of guessing one. And in an inspection years later, the reading, the limit and the instrument together are the evidence, where a tick is only a signature.

The cost is a few seconds per line and a calibrated instrument on the test bench, which the FAT should have anyway.

It gets harder when a result is marginal. 149 Pa against 150 is a pass, and the written number is how someone notices later that it was close.

Every AeroSano unit is FAT-tested and witnessed, and the FAT report goes into the equipment file compiled during production, so IQ starts from a complete record.

Talk to an engineer: contact@humiley.com · +84 28 7777 6668 (Viet Nam office)

Related

More on this subject