Skip to content

Newsroom

News & Insights

Company news from Humiley Group INC and technical notes on cleanroom HVAC, GMP validation, semiconductor environments and energy-storage engineering.

  • 780 articles

Everything

From the Humiley newsroom

32 articles tagged #Automation.

Keep the BMS outside the EMS validation boundary

When the BMS and the validated EMS share one platform, the validation boundary takes in the control logic and every setpoint change becomes change control. An EMS with its own sensors, database and QA alarms under Part 11 and Annex 11 allows the BMS to be managed under good engineering practice.

InsightRead

Operators run the plant from BMS graphics, so errors there become operating errors. Check each screen for five things: every value has a unit and a tag, the setpoint sits beside the actual value, alarm colours follow one convention, stale values look different from live ones, and room names match the room codes.

InsightRead

21 CFR Part 11 and EU GMP Annex 11 overlap on validation, access control and audit trails but differ in emphasis: Part 11 on electronic signatures, Annex 11 on a risk-based system lifecycle. Fixing the destination market in the design basis means the URS and validation plan for BMS, EMS and SCADA are written once.

Read

ALCOA+ on the EMS is a design requirement

Environmental monitoring and BMS data that support GMP decisions must meet ALCOA+. In practice that means individual logins, time-synchronized controllers, an audit trail users cannot disable, alarms acknowledged with name and comment, and tested backups, with GMP-critical parameters separated early onto a validated system.

Read