Purified Water passes conductivity and TOC in real time. The microbial count for the same sample arrives at least five days later.
By then the water is in the product.
The European Pharmacopoeia monograph for Purified Water in bulk gives 100 CFU/mL as an appropriate action level under normal conditions, counted by membrane filtration on R2A agar after not less than 5 days at 30–35 °C. For Water for Injections in bulk the figure is 10 CFU per 100 mL. USP's informational chapter <1231> gives the same two figures.
Both are action levels, set out in the production section of the monograph. A count above 100 CFU/mL means investigating, acting on the system and assessing the batches that used the water. That news is always late, so the working number has to be lower. WHO's guideline on water for pharmaceutical use says alert and action levels should be established from historically reported data. A loop that normally returns 2 or 3 CFU/mL should raise a flag long before 100.
The same guideline says samples should be taken from points of use, with the same methodology as production. If operators draw water through a hose, the sample goes through that hose. A sanitized, well-flushed sample valve tests the loop, and the hose is usually where the growth is.
How is the worst point of use on your loop sampled: through the hose, or at a sample valve?