Skip to content

Life Sciences

500 ppb TOC: what conductivity cannot see in pharmaceutical water

  • Life Sciences
  • 1 min read

Purified water can meet its conductivity limit with sugar dissolved in it.

Conductivity sees ions. Sucrose, alcohols and most of what a biofilm sheds carry no charge, so the conductivity cell reads straight past them. Total organic carbon, TOC, is the test that picks them up.

The limit is 0.50 mg/L of carbon, which is 500 ppb. USP <643> applies it to bulk Purified Water and Water for Injection, and the Ph. Eur. monographs for the two waters carry the same figure.

A well-run loop sits far below 500 ppb, so the working number is the trend. A slow rise over weeks points to something ageing: ion-exchange resin, an RO membrane, a TOC-reduction UV lamp near the end of its life, or biofilm settling into a dead leg. A step up after maintenance points to something new in the loop, such as a gasket or a hose that leaches.

A grab sample deserves caution. It picks up carbon from the bottle, the air and the hands that took it, so a laboratory result above the on-line reading is common and proves little about the loop. The on-line analyser has a limit of its own: it reports one point, often on the return. A rise there says that something changed, and leaves you to find where.

What does your loop normally read, and at what value does someone get a call?

Industries

Related

More on this subject

Engineering's part of the product quality review

The 2013 text of EU GMP Chapter 1 lists the qualification status of relevant equipment and utilities among the items a product quality review should include. Engineering can make that line believable with four more inputs: changes in the period, excursions and trends, calibration and maintenance failures with product impact, and the status of engineering CAPAs.

InsightRead

Knowledge management in ICH Q10, in plain terms

ICH Q10 names knowledge management as one of two enablers of the pharmaceutical quality system: a systematic approach to acquiring, analysing, storing and disseminating information about products, processes and components. In a technology transfer, that means handing over the reason behind each parameter, along with the batch record.

InsightRead