A zero-static diaphragm valve puts the weir of a user-point valve inside the main loop, which removes the branch dead leg entirely.
The valve, sometimes called a block or point-of-use valve, is machined from a body that forms part of the loop. With the valve closed, loop water keeps sweeping across the diaphragm face. When it opens, water leaves straight from the loop. Between uses there is nowhere for water to stand.
Compare that with a tee and a standard valve. ASME BPE limits branch dead legs by the ratio of branch length to diameter, and the guidance is tight. On paper a short tee meets it. On site the valve gets rotated for access, an extra fitting appears, and the measured ratio grows. A hot WFI loop tolerates that better than an ambient one; a cold purified water loop does not.
The block body is the expensive option, and usually a longer lead item than a tee with a standard valve. It also has to be installed at the angle at which the valve body drains. That angle belongs on the isometric drawing, where the inspector and the fitter can both see it.
For user points on WFI and PW loops, we think the cost is worth it.
Humiley's clean utilities design covers PW, WFI and Pure Steam loops, and the valve at each user point is chosen as part of that design.
Industries




