Access to both faces of the coil

  • Manufacturing & Distribution
  • 1 min read

A coil that can be reached from only one side gets cleaned on one side.

Cooling coils foul on the air-entering face first. Dust that slipped past the pre-filters lands on wet fins and stays there. But the leaving face is where the drain pan sits and where standing water and growth show up. A hygienic unit needs a way to reach both.

Upstream, that means an access section between the filter and the coil: a door wide enough to get a hand and a cleaning lance in, and enough depth to work without leaning on the filter frame. Downstream, a second access section between the coil and the fan, so the leaving face, the pan and the eliminator can be seen and cleaned.

The drain pan matters as much as the doors. It should run under the whole coil and a little past the leaving face to catch carryover, slope toward the outlet so water does not stand, and be removable or reachable for cleaning. A trap sized for the fan pressure keeps the pan draining when the unit runs.

Each access section adds length and some cost to the unit. On a plant room layout that is tight, it is the first thing value engineering tries to remove, and the maintenance team pays for that choice for years.

Every AeroSano unit goes through a witnessed FAT, where access, drainage and the coil faces can be checked before shipping.

AeroSano hygienic air handling units

Related

More on this subject

Handover formats maintenance can use

Split the handover by use. As-built CAD or BIM, the asset register, PLC and BMS source and the control narrative come in native, editable form. Signed protocols and certificates come as searchable PDF. One index by system and tag joins them, and the formats go into the contract before the first document.

InsightRead

A single differential gauge across several AHU filter stages cannot say which stage loaded, so teams change everything or guess. A gauge per stage, marked with the commissioning reading and change limit and kept on the calibration list, allows each stage to be changed on condition. BMS transmitters add a trend.

InsightRead