Pre-cool before the rotor in the tropics

  • Manufacturing & Distribution
  • 1 min read

A desiccant rotor sized to remove all the water in wet-season outdoor air ends up oversized and runs hot.

A rotor is good at one thing a cooling coil cannot do: pulling the dew point below the point where a coil would freeze. It is an expensive way to remove bulk moisture. Every kilogram of water it adsorbs has to be driven off again with regeneration heat, and the process air leaves the rotor warmer than it entered, so it needs cooling afterwards anyway.

Take a dry room supplied at −40 °C dew point, about 0.08 g of water per kg of dry air, and fresh air on a wet afternoon at around 26 °C dew point, about 21 g/kg. A chilled-water coil ahead of the rotor can bring that air down to roughly 10 °C dew point, 7.6 g/kg, by condensation. That takes out about 14 g/kg, around two thirds of the moisture, before the rotor sees the air. The rotor is left with the last 7.5 g/kg.

Handling a third of the water, the rotor can be smaller, needs less regeneration heat and holds its leaving condition more easily. The price is one more coil, a condensate drain to design properly and a little more fan pressure.

Our desiccant units run to −60 °C dew point with ±2% RH control, and staging is decided from the project's own load calculation.

Talk to an engineer: contact@humiley.com · +84 28 7777 6668 (Viet Nam office)

Related

More on this subject

Before the supply fan is selected, check whether the coil sheet quotes a wet or a dry air pressure drop, and read it with the entering condition: dry- and wet-bulb at the peak dew point case. Then check leaving dew point against room RH, face velocity below about 2.5 m/s and a realistic chilled-water ΔT.

InsightRead