A V-belt sheds rubber dust for its whole working life, and in a GMP supply AHU that dust is blown toward the final filters.
In many units the fan section sits after the bag filter and before the last filter stage, so belt wear lands on the HEPA or on the final filter in the unit. While the filters hold, the room is protected. The filters simply carry a load nobody selected them for, and the fan section floor collects a black film that someone has to clean and explain at inspection.
The drive also costs energy. A belt and two pulleys lose a few per cent of the shaft power when new and correctly tensioned, and more as the belt stretches and slips. A plug fan has its impeller on the motor shaft, so that loss is gone, and a VFD or EC motor changes the airflow without a pulley swap.
Maintenance is the third difference. Belts need tension checks, alignment and replacement on a schedule. The plug fan needs bearing checks and a clean impeller.
Belt drive still has a place. A large housed centrifugal fan can beat a plug fan on efficiency at high pressure, and pulleys set a fixed speed where there is no drive. For a hygienic supply AHU we would still pick direct drive and accept the higher price of the fan and its speed control.
AeroSano hygienic AHUs are built by qualified partners under Humiley engineering control, and every unit is FAT-witnessed.
Industries




