An operator types a new alarm limit for a cold room into the EMS. 8.0 °C goes in as 80, and nothing on the screen objects.
After that the room can warm to 15 °C in silence, and the audit trail will show a valid change by an authorised user. Data integrity controls protect what was entered. They cannot tell whether it was the right number.
That gap is what clause 6 of the 2011 text of EU GMP Annex 11, Accuracy Checks, is about. Where critical data are entered manually, there should be an additional check on their accuracy. The check may be done by a second operator or by validated electronic means. How critical the data are, and what a wrong entry could cause, should be covered by risk management.
That third sentence does the sorting. A comment field is not critical data. An alarm limit, a setpoint, a calibration offset or a recipe value usually is, and the risk assessment should name them.
For a BMS or EMS the electronic route is often the easier one to live with: a permitted range on each critical field, so that 80 is refused where the limit must lie between 2 and 10, and a confirmation step that shows old and new value before the change is accepted. A second person at the screen works too, but only as well as the night shift is staffed.
Either way it starts as a line in the URS. A check added after validation is a change.
Industries




