Product in a 15–25 °C store spends its warmest minutes between the truck door and the first rack.
The racks are mapped. The vehicle has active cooling, and in Viet Nam's climate it needs it, since an ambient vehicle cannot rely on insulation alone. The dock between them often sits in neither record. A roller door stands open to the yard on a hot afternoon, a pallet waits on the apron while the forklift finishes another job, and nobody logs those minutes.
A dock shelter or inflatable seal closes the gap between truck body and building, so the trailer opens into the building instead of into the yard. A rapid-roll door on each bay opens only while a pallet passes. Behind it, a staging zone is held to the same 15–25 °C as the store, with its own mapping and a probe in the monitoring system, so a pallet that has to wait does so in controlled air.
Smaller items matter as much. Dock levellers need insulation and a seal at the pit. The dock door and the store door should be interlocked so both are never open at once. And someone has to write down how long a pallet may sit in staging before it is racked, or the staging zone slowly turns into overflow storage.
Humiley's engineers can review a dock layout against the store's mapping plan.
How long does a pallet sit on your dock on a busy morning?