Bicarbonate-buffered cell culture media sit in incubators at around 5% CO2, and when that supply stops, the pH starts to rise.
Most media used in cell culture work this way, which makes the CO2 supply part of the process, and most of its design has to be on the layout early.
Cylinders or bulk comes first. Cylinders need a manifold room, ideally outside the clean area with access for cylinder trolleys. A bulk liquid tank needs an outdoor pad, truck access and a vaporiser. The consumption estimate of the incubators, plus any bioreactor overlay, decides which.
With cylinders, the manifold is normally two banks with automatic changeover. The alarm that matters goes off at changeover, while the second bank is still feeding, so someone replaces the empty bank before both are gone. It should reach a person who answers at night and at weekends, through the BMS or the monitoring system, not a lamp on the manifold room door.
Where cylinders sit indoors, CO2 displaces air. Ventilation of that room and a gas detector at the door are questions for the local safety code and the site's EHS team.
At each incubator there is a regulator and a point-of-use filter, with the purity grade of the gas written into the URS. The pipe run from the manifold also crosses the cleanroom boundary somewhere, and that penetration needs a sealed detail on the drawings.
Process piping is in our engineering scope. Who owns the CO2 system on your projects?