Chilled-water coils run out of room somewhere above freezing, which is why −60 °C dry rooms in battery plants run on desiccant.
At the dew points most cleanrooms need, both routes work, and the comparison turns on which energy you pay in. A coil dries air by condensing water on a cold surface; drier air means colder water, a lower evaporating temperature and more compressor kWh per kilogram of water removed. A desiccant rotor adsorbs the moisture and is dried out again by a stream of heated reactivation air, so most of its bill is heat.
How hot that stream must be comes from the rotor manufacturer's curve. For many silica gel rotors it sits above 100 °C, and that figure decides which heat on site counts. Chiller condenser heat is plentiful but far too cool to do the whole job; it can still preheat the reactivation air and cut what the boiler or steam supply adds. A plant with spare boiler capacity or process waste heat gets a very different bill from one buying electric heaters.
Air leaves the rotor warm, so a desiccant system needs a sensible cooling coil after it. The coil route often needs reheat after overcooling. Put both into the sums before comparing anything.
Humiley supplies desiccant dehumidification down to −60 °C dew point.
What waste heat does your site throw away today?
Industries



