The gap under a cleanroom door is often the largest single leak in the room, and the 10–15 Pa cascade is held against it.
Supply goes in, extract comes out, and the difference leaves through the room's gaps at its pressure. Door undercut and door perimeter are usually the biggest of them, so the offset air needed to hold the cascade depends heavily on how the doors are hung.
Put a number on it. Treating the undercut as a sharp-edged opening, a 900 mm door with a 5 mm gap passes about 50 m³/h at 15 Pa. Let the gap grow to 10 mm and it is about 100 m³/h, from one door, before the perimeter is counted.
Designs drift between the calculation and the site. The calculation assumes one door leakage figure, then the door set arrives with a larger undercut or the floor finish ends up lower than drawn. At commissioning the cascade will not hold, and the fix is more offset air and more fan power, sometimes from an AHU with no margin left.
A drop seal closes the floor gap when the door shuts and lifts clear when it opens. It needs setting and a flat floor, and the mechanism has to be cleanable, but it is easier to live with than a raised threshold that trips people and stops trolleys.