Gravity drains get the service void first. Cable trays get it last. Everything in between is ordered by how easily it bends.
A gravity drain needs a continuous fall from the first fitting to the stack. Every metre of run costs height, and it can never go up and over anything. So drains are routed first and the rest moves around them.
Large ducts come next. Airflow and velocity set their size, and a main supply duct is often the deepest item in the void. Flattening one costs pressure drop and fan energy for the life of the building.
Pressure pipework follows. Chilled water, heating water and compressed air can change level with a pair of elbows. Clean utility lines are the exception, with slope and drainability rules of their own, so treat them closer to the drains. Sprinkler mains bend easily too, but the drops to each head are fixed by the ceiling layout, so reserve their zone early.
Cable trays and ELV containment go last. They bend almost anywhere.
One more item claims space without appearing on any trade's drawing: access in front of dampers, valves and filter housings. Model it as a volume, or it is the first thing lost.
Coordinate in the order the trades arrive on site instead, and sooner or later a drain ends up needing a pump.
Which service loses the argument first on your projects?