Part 11 asks for 2 distinct identification components in a non-biometric electronic signature, such as an ID code and a password.
Most systems get that far. Inspectors look at the second signature in the same session.
21 CFR 11.200(a)(1) splits the case in two. When one person signs a series of records during a single, continuous period of controlled system access, the first signing uses all the components. Each later signing in that period must use at least one component that only that person can execute. In practice that means the password. A user ID is printed on badges and in reports, so it does not qualify.
When the signings are not in one continuous period, every signing uses all the components again.
The checks worth writing into OQ for a SCADA or batch system:
- The second approval in a session asks for the password, and a click on a pre-filled name is refused.
- "Continuous session" is defined in writing, with the inactivity timeout that ends it.
- After a timeout or a user switch, the next signing asks for both components.
The weak point is usually the second item. If nobody can say when a session ends, nobody can say which rule applied to a given signature.
Humiley's automation scope covers SCADA designed to 21 CFR Part 11 and Annex 11, and these checks belong in its qualification from the start.