Skip to content

Life Sciences

eCTD: what makes a dossier electronic

  • Life Sciences
  • 1 min read

What makes a dossier an eCTD is a file that no assessor reads as a document: index.xml.

eCTD is the electronic format for submitting the CTD. The content is still the five CTD modules. Around them sits a fixed folder structure and an XML backbone, index.xml, holding a pointer to every file with its checksum.

Submissions arrive as numbered sequences: in the ICH example, 0000 for the original and 0001 for the next. In each one, every document carries an operation. In version 3.2.2 of the specification the choices are new, append, replace and delete, and a replacing document names the earlier one it supersedes. That is how the agency's software shows the current dossier out of everything sent over the years.

For a plant the consequence sits in Module 3. Each change to a specification or a process description becomes a sequence that replaces particular files. A 300-page PDF is replaced whole for a one-line change, so the granularity chosen for the first sequence stays with the site.

Version 4.0 handles the life cycle differently and is being phased in. Confirm with the target agency which version and which regional Module 1 specification apply.

Industries

Related

More on this subject

EN 1886 casing: five classes on one datasheet

An AHU casing is described by five EN 1886 classes: strength D1–D3, leakage L1–L3, filter bypass up to F9, thermal transmittance T1–T5 and thermal bridging TB1–TB5. A witnessed FAT can test leakage on the real unit; transmittance and bridging come from a laboratory model box, so the model box report belongs with the offer.

InsightRead

Engineering's part of the product quality review

The 2013 text of EU GMP Chapter 1 lists the qualification status of relevant equipment and utilities among the items a product quality review should include. Engineering can make that line believable with four more inputs: changes in the period, excursions and trends, calibration and maintenance failures with product impact, and the status of engineering CAPAs.

InsightRead