A spare HEPA filter with a crushed corner is scrap, and the day you find out is the day you need it.
Critical spares sit for years before they are used, and the store is often the least controlled room on site. Five checks for a walk through it:
- Filters stand the way the arrows on the carton show, in the original carton, off the floor, with nothing on top beyond the stacking mark. The oldest goes out first.
- Spare motors are dry, and the shaft is turned by hand at the interval the manufacturer gives, with the date on a tag. Bearings left in one position for two years can mark their races.
- Belts, gaskets and seals carry the date of manufacture and the shelf life on the label. Rubber ages on the shelf, faster in heat and light.
- Drives, controllers and sensors stay in anti-static packaging with desiccant, in an air-conditioned room. Drive manufacturers also ask for the DC-bus capacitors to be reformed after long storage; the manual gives the interval.
- Every item is labelled with the asset tag it fits and the part number, so the night shift does not have to guess which actuator fits which AHU.
Most of this is in the manufacturers' storage instructions, which tend to stay in the box. The work is copying those intervals into the spare-parts register as tasks with dates.