An operating theatre gets a maintenance shutdown about as often as the emergency department closes for a weekend.
Filter changes, damper repairs and requalification go into gaps in the surgery list, one room at a time, while the rooms next door keep operating.
The neighbours are the difficult part. A theatre is held positive to its corridor. An airborne infection isolation room is held negative, and under ASHRAE 170 the minimum for that room is only 2.5 Pa. Open one ceiling panel or stop the AHU serving the room beside it, and a margin that small can disappear or reverse for the length of the job. In a hospital that difference is infection control.
Before anyone climbs a ladder, the method statement should name the rooms that share the AHU, the dampers that will keep the neighbours at setpoint while one room is off, and the route the dirty filters take out of the zone. It should also say what has to pass before the room goes back to the theatre manager. After a terminal HEPA change that means an installed leak test, followed by airflow and pressure checks.
The order of the work comes from the criticality assessment. The unit serving the theatres ranks above the office unit, and its spares are on the shelf. For failures outside the plan, our maintenance service runs 24/7 response across Southeast Asia under a maintenance agreement.
Industries




