HVAC energy is decided at Concept stage

  • Engineering Solution & Consultancy
  • 1 min read

By the time the AHU schedule is issued at Detail design, most of the HVAC energy the plant will use over its life is already decided.

Our engineering division runs energy modeling targeting a 30% reduction in HVAC energy. On a Concept → Basic → Detail → Build roadmap, a target like that is realistic only while the model can still change the decisions that drive energy, and most of those are taken at Concept. Room grades are one: whether a room drawn as Grade C really needs to be C sets its air change rate. The air strategy is another, including whether dilution air goes through the central AHU or a local recirculation loop. The fresh-air fraction, exhaust heat recovery, the reheat source and the chilled water temperatures are all set early too.

At Basic design the model can still move equipment sizes and control sequences. By Detail, the ducts are routed, the plant room is drawn and the AHUs are selected, and a model run mostly reports what the building will consume.

The 30% is a modeling target. What a given plant achieves depends on its process, its climate and how much of the design was already fixed when the model first ran.