An SOP register answers the change-control question

  • Engineering Solution & Consultancy
  • 1 min read

Engineering revises the SOP for HEPA filter change, and every SOP that calls it up may now be out of date.

Finding those is the job of the SOP register. Humiley's master register template covers 536 SOPs across 20 departments, and what makes a register usable is what it records against each one.

A register that can answer the HEPA question should hold, for every SOP, the owning department, the author and approver, the current version and effective date, the next review date, and the documents it calls up: forms, logbooks and other SOPs. That last column is the one most registers leave empty, and it is the one a change control reads. With it, the cleaning, environmental monitoring and requalification SOPs that refer to the filter change come out of one filter. Without it, someone searches file names, misses one, and the superseded version stays on a shop-floor clipboard.

EU GMP Chapter 4 expects documents to be reviewed regularly and kept up to date, and superseded versions kept out of use. A review date in the register turns that into a due date with an owner, and the overdue list per department can be printed before an inspector asks for it.

We use the register when we help a plant build or restructure its documentation for EU-GMP, alongside the qualification work.

Which column is missing from your SOP index today?

Industries

Related

More on this subject

The 2011 text of EU GMP Annex 11 (clause 6) says that where critical data are entered manually there should be an additional check on their accuracy, by a second operator or by validated electronic means. For a BMS or EMS alarm limit, a permitted range on the field and a confirmation step are the practical answer.

InsightRead

Annex 11 and the BMS-to-EMS link

The 2011 text of Annex 11 (clause 5) says systems that exchange data electronically should include built-in checks for correct and secure entry and processing. On a BMS-to-EMS link we read that as status flags, a communication watchdog, end-to-end checks of units and time stamps, and a loss-of-communication test in the qualification.

InsightRead

EU GMP Annex 11 clause 3.2 makes supplier competence and reliability part of computerized system validation, with the need for an audit set by risk. For SCADA, BMS and EMS, supplier records can reduce the testing the user repeats; the URS, risk assessment and configuration tests such as alarm limits and user roles stay with the user.

InsightRead