At the Grade A limit of 3,520 per m³, a counter sampling 28.3 L a minute records about 100 particles of 0.5 µm and larger.
That 3,520 does two jobs in Annex 1 (2022). It is the classification limit in Table 1, and Table 5 repeats it as the Grade A maximum for monitoring, at rest and in operation. A result above it breaches the Annex 1 limit. What the site sets sits below: its alert levels, and any action limit it wants tighter than the table.
Those site levels are usually written per m³, while the counter records whole particles in a small sample. One particle in 28.3 L reports as about 35 per m³, two as about 71. At that resolution an alert of 50 per m³ means two counts in a sample, and an alert of 20 per m³ means a single count. An alert at 3,000 per m³ is about 85 counts, in a zone that normally records zero or a handful.
Writing each level as counts per sample, with the sample volume beside it, shows what the alarm will do before anyone configures it. A later change of flow rate or sample time then shows up as a change to the levels.
In Humiley's Life Sciences work the Contamination Control Strategy is the organizing document, and its monitoring plan should state the sample volume behind every level.
How are the Grade A levels in your monitoring plan written: per m³ or per sample?
Industries




