Type 24 MBH into a kW column and the room gets sized for about 3.4 times the heat it will actually see.
MBH is thousands of Btu per hour, the M being the Roman thousand. It turns up on datasheets for washers, ovens, autoclaves and packaging machines from US suppliers. 24 MBH is 24,000 Btu/h, and at 3,412 Btu/h per kW that is about 7.0 kW. The load calculation works in watts, so the figure should be converted once, by one person, and marked as converted.
Converted twice, once in a vendor email and again by the designer, the same machine shrinks to about 2 kW. Both errors produce a coil and an airflow that look reasonable on paper.
The second check matters more than the arithmetic. A datasheet may list electrical input in kW and heat to the space in Btu/h, and they are different numbers, because part of the input leaves in exhaust, drain water or hot product. Some datasheets also split heat to the room into sensible and latent, and the latent part belongs in the moisture balance.
A process heat schedule that holds up uses one unit for every line, with a column saying whether each figure is input or heat to room. AeroSano air handling units are engineered from the project's own airflow schedule and load calculation, so a wrong line there ends up in the equipment.




