ICH Q10 defines the pharmaceutical quality system, PQS, in one line, and the word "procedure" is not in it.
The line: the management system to direct and control a pharmaceutical company with regard to quality. A site can have five hundred SOPs on the document server and still be unable to show how it directs or controls anything. The SOPs are how the system gets written down.
EU GMP Chapter 1 (2013 text) says a pharmaceutical quality system must be in place, and that it should be fully documented and its effectiveness monitored. Documented is the half that five hundred SOPs take care of.
Section 3.2 of Q10 gives the system four elements: process performance and product quality monitoring, corrective and preventive action (CAPA), change management, and management review. Q10 also names two enablers, knowledge management and quality risk management, and between the two lists sits a section on management responsibility.
That makes a quick test. Pick an SOP and ask which element it serves. The environmental monitoring SOP feeds monitoring; the deviation SOP feeds CAPA. Then ask where the trends from either one are reviewed, and by whom. If nobody can say, the fourth element is missing.
Topics
Industries



