One leaflet in the wrong language, left in a feeder from the previous run, can end in a recall.
The more SKUs a line packs, the more often it changes over. Each changeover is a chance for something from the last pack to ride into the next: a leaflet, a label reel, a carton with another market's text.
EU GMP Chapter 5 says that before packaging operations begin, steps should be taken to ensure the work area, packaging lines, printing machines and other equipment are clean and free from any products, materials or documents previously used. It adds that the line clearance should be performed according to an appropriate checklist, and leaves the checklist to the site. A workable one:
- Nothing from the previous run on or under the line: product, leaflets, labels, cartons, batch documents. Look inside feeders and behind guards.
- Printed materials at the line, and the batch number and expiry in the coder, match the packaging order.
- Counters are at zero, and the code reader is challenged with a known reject.
- Reject bins, sample trays and waste bags are empty.
- The operator signs the checklist and a second person checks it before the first unit runs. The second check is practice; the chapter does not ask for it.
For anyone laying out a new line: clearance takes as long as the hiding places allow. Open frames and clear guards shorten it.
How long does a full clearance take on your busiest line?