Skip to content

Engineering Solution & Consultancy

What makes a SKU in pharma

  • Engineering Solution & Consultancy
  • 1 min read

One molecule can be forty SKUs before anyone has touched the formulation.

Take one tablet in two strengths, sold in packs of 10, 30, 60 and 100 across five markets, each with its own language and artwork. That is 2 × 4 × 5 = 40 stock-keeping units.

A SKU is one uniquely identified sellable item. In pharma, what makes one is the combination of product, strength, dosage form, pack size, pack type and market. Change any of these and the item gets a new code, new artwork and a line of its own in the product master data.

It is a commercial term. GMP texts and the CTD do not define it; they speak of products, strengths, pack sizes and container closure systems. Each SKU still has to match what is registered for its market, down to the pack size and the label text.

Packaging formats, printed components, warehouse positions and line changeovers all follow the SKU list.

Humiley's EU-GMP roadmap consulting covers QMS, the CTD/eCTD dossier and technology transfer.

When a product list is on the table, ask whether it is counted in molecules or in SKUs.

Industries

Related

More on this subject

PQS: the system your SOPs belong to

ICH Q10 defines the pharmaceutical quality system as the management system to direct and control a pharmaceutical company with regard to quality. It has four elements (monitoring, CAPA, change management, management review) and two enablers (knowledge management, quality risk management). SOPs are how the system is written down.

InsightRead

The room data sheet changes jobs at qualification

A room data sheet begins as a design input that changes weekly and ends as the qualified record behind OQ, PQ and monitoring limits. Each role needs different revision control. Agree the freeze point before DQ, so design and QA are never editing different versions of the same room.

InsightRead