The motor plate carries most of what a variable speed drive needs to know, and it is often read once, in a hurry, by torchlight.
IEC 60034-1 sets out what a rating plate carries. It is worth reading slowly, with the terminal box open and the drive parameters on screen.
- Voltage, frequency and connection. A plate marked 230/400 V belongs in star on a 400 V supply; 400/690 V belongs in delta. Compare the links in the terminal box with the plate. A motor left in star when it should be in delta still runs, with a fraction of its torque, until it overheats under load.
- Rated current, power, speed and power factor, for the connection in use. These go into the drive's motor data, and the overload setting follows the plate current.
- Efficiency class. The IE code under IEC 60034-30-1 should match what the specification asked for.
- Enclosure, insulation class and ambient. The IP rating has to suit the location. Ratings assume an ambient of no more than 40 °C and an altitude up to 1,000 m unless the plate says otherwise, and a motor in the airstream after a heating coil may see more.
- Bearings and regreasing. Larger motors give bearing sizes, grease quantity and interval, on the plate or beside it. Copy them into the maintenance task.
Photograph the plate before the guards go on, and file the photo against the asset tag. In five years the plate may be painted over.
Topics




