Reheat holds the RH until it stops

  • News
  • 1 min read

18 °C air at 60% RH, reheated to 22 °C, reads about 47% RH. It still carries 7.7 g of water per kilogram.

Sensible heating runs horizontally across the psychrometric chart, so humidity ratio and dew point stay where they were. The RH figure drops only because warmer air could hold more water.

On a system that uses reheat to pull room RH down, that matters on the day the reheat stops. If the heater contactor fails open or the hot-water valve sticks shut, the supply air arrives in whatever state the cooling coil left it, and room RH rises with it. A room that stays under its limit only because reheat is running has no margin for a single component fault.

The early warning is in the reheat output. Put the reheat valve position or heater stage on the same trend as room RH. When the room holds its RH but the reheat needed to do it has been climbing for weeks, with no change in production or weather, the cooling coil is removing less water than it did at OQ. The usual suspects are a fouled coil, chilled water arriving warmer than design, or a valve that no longer opens fully.

We count reheat energy at design stage, as part of designing for the tropical wet season.

What has the reheat valve on your most difficult room done over the last three months?