Skip to content

News

Sensible heat recovery in the tropics: about 14% of the gap

  • News
  • 1 min read

A 70%-effective sensible heat exchanger recovers about 14% of the outdoor-to-exhaust gap on a humid Ho Chi Minh City afternoon.

Take outdoor air at 29 °C with a 26 °C dew point, and cleanroom exhaust at 20 °C and 45% RH. The outdoor air carries about 83.7 kJ/kg; the exhaust about 36.7. The gap is roughly 47 kJ/kg, and that is what the fresh-air coil has to remove if nothing is recovered.

A sensible-only exchanger, plate or run-around, works on the 9 K temperature difference. At 70% effectiveness it takes about 0.7 × 9 × 1.03 ≈ 6.5 kJ/kg off the incoming air. That is 14% of the gap.

The rest is moisture. The outdoor air holds around 21 g/kg, the exhaust around 6.5 g/kg. Only an enthalpy exchanger moves that, usually a wheel or a membrane plate, and with it comes the risk of exhaust air carrying over into the supply, which QA will ask about.

The supply side of the exchanger runs below the 26 °C dew point, so it condenses. Part of the recovered 6.5 kJ/kg leaves as water, and the plate or coil needs a drain pan, a fall to drain and cleanable surfaces, like any cooling coil.

On a large fresh-air system, 6.5 kJ/kg is still a useful number of kilowatts; payback depends on airflow, hours and tariff. A study that assumes temperate recovery figures will overstate it. Cutting the fresh-air volume, or drying it less deeply where the product allows, usually saves more.

More notes on HVAC in the tropics

Related

More on this subject

Two envelopes for a cleanroom HVAC tender

Score the technical envelope of a cleanroom HVAC tender and sign it off before any price is opened. Issue the scoring sheet with the tender: mandatory items pass or fail, the rest weighted, for example 40% technical depth and 20% each for documentation, delivery and service. Score every listed deviation.

InsightRead

Energy recovery in once-through potent suites

Many potent suites recirculate through safe-change HEPA housings; where the risk assessment rules that out, every cubic metre is tropical outdoor air. Run-around coils recover heat with the airstreams fully separated, wheels open a leakage path, and dedicated fresh-air pre-cooling targets the latent load. Our energy modeling targets a 30% HVAC energy reduction.

InsightRead