Skip to content

Manufacturing & Distribution

Set AHU door swing by casing pressure

  • Manufacturing & Distribution
  • 1 min read

An access door on the positive-pressure side of an AHU fan that opens outward is being pushed off its own seal every hour the unit runs.

Downstream of the fan, the casing sits above room pressure. On an outward-swinging door the gasket seats against the outside of the frame stop, so casing pressure pushes the leaf away from it. The latches still hold the door shut, but the gasket carries less compression than it was designed for, and over the years that becomes leakage. Upstream of the fan the casing runs below room pressure, and there an outward-opening door is pressed onto its seal.

That gives each section its own swing: inward on positive sections, outward on negative ones, so the pressure difference keeps the leaf on the gasket.

Swing also decides what happens when someone opens a door with the fan running. An inward-opening door on a positive section cannot be pulled open against the pressure. An outward-opening one on the same section can fly open once the latch is released, so if the layout forces that arrangement, the door needs a two-stage safety latch.

We recommend putting door swing and latch type on the GA drawing, section by section, next to the EN 1886 leakage class the unit is specified to. If a delivered unit leaks more than expected, the doors on the positive side are a sensible first place to look.

AeroSano hygienic air handling units

Related

More on this subject