In Annex 1's particle table, the Grade D in-operation cells hold no number. A footnote says the limits are not predetermined.
That leaves the limit to the manufacturer: set from a risk assessment and routine data, and defended to an inspector. At rest, Grade D is still ISO 8, 3,520,000 particles of 0.5 µm and larger per m³, and that part is fixed.
The usual shortcut is to copy the at-rest figure into the in-operation column. Say a year of in-operation counts in a packing corridor never goes above 400,000 per m³. An action level of 3,520,000 then sits 8.8 times above anything the room has done. It will stay quiet through a failed door seal or a return grille blocked by pallets.
A limit that tells you something comes from the room's own data:
- In-operation counts through PQ and the first months of routine monitoring, including shift changes, material transfers and cleaning.
- Each room on its own. A packing corridor and a wash room behave differently.
- Alert and action levels set from that distribution, and checked against what the process in the room can tolerate.
- The reasoning written into the CCS, with the response to an excursion.
- A review against the trend at a fixed interval.
Talk to an engineer: contact@humiley.com · +84 28 7777 6668 (Viet Nam office)
Industries



