−40 °C dew point is about 0.08 g of water per kg of dry air; −60 °C is under 0.01 g, and that step can mean a second rotor stage.
Airflow and target dew point usually make it onto the inquiry form. The rotor size, its reactivation heat and the coils around it depend just as much on four more inputs, and many inquiries leave them out.
- Process airflow, split into fresh air and return. The fresh air carries the moisture load; the return is already dry.
- Air condition entering the rotor, after any pre-cooling coil, as dew point or g/kg. A few grams per kilogram at the rotor inlet move the selection more than any other input.
- Target supply dew point and its tolerance, written as a number the vendor can be tested against at handover.
- Reactivation heat source: electric, steam, hot water or recovered heat, and at what temperature. The deepest dew points may need hotter reactivation air than the site has.
- Leakage allowance: moisture entering through the envelope, doors and people. In a dry room this can be the largest single load.
- Redundancy: what happens to the room when the rotor drive, the reactivation heater or the fan stops.
Change any of these after the order and the selection changes with it.
Humiley's desiccant units reach −60 °C dew point, engineered from the project's own load calculation.
Which of the six was missing from your last inquiry?