A filling line changed in March can still run on an SOP that passed its scheduled review in May with no edits.
EU GMP Chapter 4 asks for documents to be reviewed regularly and kept up to date, and gives no interval. Many sites write 2–3 years into the document control SOP. That is defensible if the procedure also names the events that pull a review forward:
- A change control on the equipment, system or room the SOP covers.
- A deviation or CAPA whose root cause points at the procedure, including a second "SOP not followed" finding on the same step.
- A change to something the SOP relies on, such as a new disinfectant added to the approved list, or a revised environmental monitoring SOP that moves the sampling points in the room.
- An audit or inspection observation on the process, or a regulatory update.
- A new product brought into the room.
The scheduled review can be made to earn its signature as well. Before approving, the reviewer pulls the change log and the deviation log for the room since the last approval and reads the SOP against both. If they are empty and the text still matches the floor, a re-approval with no edits is a fair result.
Humiley's EU-GMP roadmap consulting covers setting up the QMS these procedures live in.