An airlock ends at the grade of the room it serves

  • Life Sciences
  • 1 min read

Draw an airlock into Grade B as a corridor with two doors and it often gets a transfer grille and leftover air.

That leftover is whatever remains once the process rooms are balanced. EU GMP Annex 1 (2022) asks for more: in its premises section it says, in paraphrase, that the final stage of an airlock should be the same grade at rest as the cleanroom it leads into. For a Grade B room that means ISO 5 at rest: no more than 3,520 particles of 0.5 µm and larger per m³.

Treated as a Grade B room in its own right, that last stage needs:

  • terminal HEPA supply, with enough air to bring the count back down after the door opens and a gowned operator steps through;
  • its own step in the pressure cascade, typically 10 to 15 Pa against the stage before it;
  • a place in the environmental monitoring program, with particle counts and pressure logged like the other Grade B rooms.

Built the corridor way, the stage tends to count closer to Grade C at rest, and the Grade B room behind it takes in the difference each time someone walks through.

On a room data sheet this is easy to write down early: give each airlock stage its own line, with grade, air change rate and pressure, the same as a process room.

Industries

Related

More on this subject

Changing a terminal HEPA while the suite keeps running

Replacing one failed terminal HEPA in a live Grade C suite starts with change control and an equivalent filter. Stop work, bag the old filter, inspect the housing, then fit and leak-scan the new filter in place. Clean and check airflow, pressures, counts and recovery before release, with the scope agreed in the change record.

InsightRead

Periodic and event-driven requalification

A new AHU on a running suite moves the pressure cascade, so its event-driven requalification reaches the differential at every door it serves. Change control sets that scope. Annex 1 (2022) separately caps periodic cleanroom intervals at 6 months for Grade A and B and 12 for C and D.

InsightRead

Three APS runs across all shifts, and the HVAC has to hold still

Annex 1 initial validation of an aseptic process needs at least 3 consecutive successful simulations covering all working shifts, then periodic runs twice a year per process, line and shift. The cleanroom must hold its qualified state throughout. Agree an HVAC freeze date with QA, and list in advance which jobs are like-for-like and which need an impact assessment.

InsightRead