Twelve air handlers bought in three tenders can arrive with nine motor frames, five belt sections and filters in seven face sizes.
Each was a reasonable choice by the vendor who sized it. Together they turn the spares list into a small warehouse, and a technician on the night shift opens the store to find that the belt for AHU-07 is the one size nobody kept.
The cheaper fix happens at specification. Write a short standardization schedule into the AHU datasheets before tender and hold every vendor to it:
- Motors from a limited set of IEC frame sizes and one efficiency class, or EC fans of one family where the project uses fan walls.
- Filters in standard face sizes such as 592 × 592 and 592 × 287 mm, so one stock covers every unit.
- Temperature, humidity and pressure sensors of one make, range and signal type, so a spare fits any AHU and one calibration procedure covers them all.
- Belts, bearings, gaskets and door handles from the same few part numbers.
The price is some loss of freedom. A vendor may have to fit a motor one size up, or a filter bank with a little more frame. Over the life of a plant that small cost usually buys a shorter spares list and faster repairs.
AeroSano units are engineered from the project's airflow schedule, and that schedule is where the standard sizes get fixed.