Which way the filter comes out of the AHU

  • Manufacturing & Distribution
  • 1 min read

A loaded bag filter carries its dust cake on the upstream face, and some of it falls off the moment the clamps release.

Where it lands depends on which way the filter leaves the frame. With upstream withdrawal the filter comes out through the upstream access section, the side that is already dirty. With side withdrawal the filters slide along rails and out through a door in the casing wall, so a used filter never crosses the downstream section. Both can be hygienic.

The layout to reject at design review is the one where the technician has to reach through, or carry a loaded filter through, the section behind the filter. On a compact unit in a tight plant room it can be the only door that fits, and nobody notices until the first change.

Seating is the other half. A filter that sits in the frame without pressing evenly onto its gasket leaks round the edge. EN 1886 treats that path as filter bypass leakage and classes the casing and frame against it, with F9 as the class for fine filtration.

After a change, go round every clamp by hand. Then write down the differential pressure across the new filter, because that first reading is the baseline every later reading is compared with.

AeroSano AHUs are FAT-tested and witnessed before they leave the factory, which is a good moment to open each filter door and try the change once.

At what stage does your team check filter access: design review, FAT, or the first change?