A crushed gasket passing 0.05% of the airflow around a filter frame cancels the whole step from H13 to H14.
EN 1822 rates the filter element in a factory test rig: H13 at 99.95% and H14 at 99.995% at MPPS. In penetration terms that is 0.05% against 0.005%, a factor of ten.
Now add a gap. If 0.05% of the airflow slips round the frame through a crushed gasket, a warped housing or a clamp that was never tightened, that bypass alone equals the whole penetration of an H13 filter. The H14 upgrade is gone, and nothing on the filter label says so.
The rig does not test your housing, your ceiling grid, the gel in a knife-edge seal, or the technician who installed it on a Friday. That is the job of the installed leak test: an aerosol upstream and a probe scanning the downstream face and the whole perimeter seal. The perimeter is where the leaks usually are.
Our view is that the money often goes to the wrong place. Paying for H14 media and then accepting a housing that cannot hold its seal evenly buys a number on a datasheet, not cleaner air.
HEPA housings are part of the AeroSano range, and every unit is FAT-tested and witnessed before it leaves the factory.
Topics



