Treating 10,000 m³/h of wet-season outdoor air takes about 186 kW of cooling, and most of it goes into water, not temperature.
A worked example, not project data. Take 10,000 m³/h of outdoor air at 29 °C with a 26 °C dew point, a normal wet-season afternoon in the tropics, and bring it off the coil at 10 °C with a 9 °C dew point.
The mass flow is about 12,000 kg/h. Enthalpy falls from roughly 83.7 to 28.0 kJ/kg, a drop of 55.7 kJ/kg. Multiply and you get about 186 kW. Only around 65 kW of that lowers the temperature. The other two-thirds condenses roughly 170 kg of water out of the air every hour.
That is the running cost of each block of fresh air a design takes in. It applies to once-through containment suites, to exhaust hoods and local extraction left on through nights and weekends, and to generous make-up rates written in to be safe.
Fresh air is needed. The quantity should still be decided the way filter grades are: from a stated requirement, with the number written down and argued. Start from pressurisation and the exhaust balance, then ask of every exhaust point whether it has to run all the time.
Our energy modeling targets a 30% reduction in HVAC energy, and the fresh-air quantity is one of the first lines we examine.



