The honest date: why optimistic design programs cost money on site

  • News
  • 1 min read

The date in the tender is the easiest thing in the proposal to promise and the most expensive thing to believe.

This is how an optimistic design date turns into site cost. The design team is oversubscribed, so drawings go out on time with hold clouds on them. The contractor mobilises against the program. Installers reach the holds, stop and raise RFIs. Answers come back as site sketches that nobody coordinated with the other disciplines. Some become rework, some become variations, and the start of qualification moves anyway.

The design deliverable met its date. The project didn't.

The warning signs are visible before award. A team list that looks the same in every proposal. No named reviewer for each discipline. A program where design finishes exactly when procurement needs it, with no float for your own review cycle.

We will tell you the honest date rather than the one that wins the work. Sometimes that means ours is not the fastest program on the table.

Planning a project for next year? Talk to an engineer now: contact@humiley.com · +84 28 7777 6668 (Viet Nam office)

Related

More on this subject

The receiving site validates the process again

A process validated at the sending site was validated with that site's equipment, utilities and people. WHO's technology transfer guideline defines validation batches as those produced by the receiving unit, and EU GMP Annex 15 (2015) covers site transfers. The earlier validation supports the new protocol. With bracketing, the number of batches could be reduced; the content of the previous validation should be available.

InsightRead

The room data sheet changes jobs at qualification

A room data sheet begins as a design input that changes weekly and ends as the qualified record behind OQ, PQ and monitoring limits. Each role needs different revision control. Agree the freeze point before DQ, so design and QA are never editing different versions of the same room.

InsightRead

The VMP item inspectors read first

EU GMP Annex 15 (2015) lists seven elements a validation master plan should cover. The summary of facilities and systems with their qualification status is the one inspectors use: last qualification, next requalification and open deviations, in one table rather than a paragraph of intent.

InsightRead