Skip to content

News

Triplen harmonics and the overloaded neutral

  • News
  • 1 min read

On a board full of single-phase electronic loads, the neutral can carry up to about 1.73 times the phase current.

In a balanced three-phase system the fundamental currents cancel in the neutral. Third-harmonic currents do not. They are in phase with each other on all three phases, so they add. The same goes for the 9th, 15th and the rest of the triplens.

The sources are everywhere in a modern plant: switch-mode power supplies in PCs and instruments, LED drivers, small UPS units, lab equipment. Each draws a peaky current rich in the 3rd harmonic. In the theoretical limit the neutral current approaches √3 times the phase current, about 1.73.

The failure is quiet. Older designs often used a reduced neutral to save copper, and the neutral is usually not protected by the breaker. It runs hot with nothing tripping. The first sign may be a discoloured terminal, or noise on an instrument reading against earth.

IEC 60364-5-52 Annex E deals with this: when 3rd harmonic content in the phase current is above 33%, the neutral current exceeds the phase current and the cable is selected on the neutral.

Note the difference from EC fan walls. Their three-phase rectifiers produce 5th and 7th harmonics, which do not add up in the neutral.

Our electrical team designs LV to MV distribution up to 22 kV, and the load mix on each board sets the neutral size.

Related

More on this subject

VFI or VI: choosing a UPS for GMP data loads

IEC 62040-3 classes UPS by how much supply disturbance reaches the load. Double-conversion VFI units keep motor-start sags, feeder transfers and generator hunting away from EMS servers and controllers; line-interactive VI units pass some through. The cost is losses, and eco mode quietly lowers the class.

InsightRead