Skip to content

Life Sciences

True copy: when a scan can stand in for the original

  • Life Sciences
  • 1 min read

Until someone has checked a scanned logbook page against the original and recorded the check, it is only a scan.

The MHRA data integrity guidance of 2018 defines a true copy as a copy, whatever the medium, of the original record that has been verified, by a dated signature or by generation through a validated process, to have the same information as the original, including the data that describe its context, content and structure.

That gives two routes. A person compares the copy with every page, both sides and attached printouts included, then signs and dates it. Or the scanning process itself is validated.

The guidance allows a true copy to be retained in place of the original if a documented system is in place to verify and record the integrity of the copy. It adds that organizations should consider any risk associated with destroying originals.

For electronic records, PIC/S PI 041-1 says a true copy of an electronic record should be created by electronic means, including all required metadata, and that creating PDF versions of electronic data should be prohibited where metadata could be lost.

Who signs the scans in your archive, and what do they compare them with?

Industries

Related

More on this subject

21 CFR 11.10(e) requires secure, computer-generated, time-stamped audit trails. For an environmental monitoring system, that means the software logs setpoint, alarm-limit and user changes itself, nobody can purge entries, every clock follows one time source, and the requirements sit in the URS before a platform is chosen.

InsightRead

What an audit trail review actually looks for

Annex 11 asks for audit trails to be regularly reviewed but gives no list. On an EMS or BMS, filter for deleted data, setpoint and alarm limit changes outside change control, alarms acknowledged without comment, repeated tests before a pass, and clock or role changes. Then a reviewer can sign for it.

InsightRead