A printed EMS trend keeps one view of the data at one scale.
The raw values between the plotted points, the alarm acknowledgements and the audit trail stay behind in the system.
FDA's 2018 data integrity Q&A draws the line between static and dynamic records. A static record is fixed, like a paper page or a PDF image. A dynamic record allows the user to interact with its content: a chromatogram whose integration can be re-run is the textbook case, and an EMS trend with raw values, sensor quality flags and an audit trail behind it is another. The guidance says a printout generally cannot stand in for such a record, and PIC/S PI 041-1 takes the same line.
In practice that changes two things. The electronic original, with its audit trail, has to be kept for the full retention period in a form that can still be read and reprocessed, including after the EMS is upgraded or replaced. And the reviewer has to look at the data in the system, where an edited value or an acknowledged alarm shows up; a signature on a printout covers only what the printout shows.
Printouts still have a place, in a batch record or a shift handover. The SOP should call them convenience copies and say where the original is held.
In the URS we write for monitoring systems, we list which data are dynamic and where the original lives.
Does your EMS review SOP say whether the reviewer works on screen or on paper?
Industries



