Skip to content

Life Sciences

Why a pasted signature image does not sign a GMP record

  • Life Sciences
  • 1 min read

Pasting a picture of your signature into a PDF report feels like signing it.

Read against 21 CFR Part 11, the picture by itself is neither kind of signature the rule describes.

It defines a handwritten signature as the scripted name or legal mark of an individual, handwritten by that individual, and adds that the act of signing with a pen or stylus is preserved. An image dropped into a file preserves no such act.

An electronic signature comes with conditions: it shall be unique to one individual, and the organization shall verify the person's identity before assigning it. The rule then ties the signature to the record: signatures shall be linked to their electronic records so that they cannot be excised, copied or otherwise transferred to falsify a record by ordinary means. A picture can be lifted from any signed PDF and placed on another in a minute.

The 2011 text of EU GMP Annex 11 (clause 14) arrives at the same place: electronic signatures are expected to be permanently linked to their respective record and to include the time and date they were applied.

That leaves two clean routes. Print the report, sign it by hand and control the paper. Or sign in a system that authenticates the signer and binds the signature to that one record.

Industries

Related

More on this subject

GMP on the electrical side

Where a SCADA, BMS or EMS records GMP-relevant data, access control, clock synchronization, alarm records and audit trails are decided by the electrical and automation engineers. Many sites keep those parameters on a separate validated EMS. Humiley's cross-functional training covers GMP, validation and project management.

InsightRead

Periodic evaluation is a review, not a rerun

EU GMP Annex 11 periodic evaluation asks whether a computerized system is still valid and compliant. Most of the evidence already exists in change control, deviation and incident records and the upgrade history. Review first, then retest only the functions the review shows are affected.

InsightRead