Once a year QA asks engineering for "the HVAC part" of the PQR, usually with a week's notice.
PQR stands for product quality review. The 2013 text of EU GMP Chapter 1 says regular periodic or rolling quality reviews of all authorised medicinal products should be conducted, with the objective of verifying the consistency of the existing process and the appropriateness of current specifications. Such reviews should normally be conducted and documented annually.
The US counterpart is usually called the annual product review. 21 CFR 211.180(e) does not use the name. It says records shall be maintained so that the data can be used for evaluating, at least annually, the quality standards of each drug product.
Twelve things are on the EU list of what the review should include. One is engineering's by name: the qualification status of relevant equipment and utilities, e.g. HVAC, water, compressed gases.
"Qualified, no change" answers it in three words. A better entry says when each system was last requalified, which changes and deviations touched it during the year, and what the trends of room pressure, water quality and filter pressure drop did.
Who writes the utilities entry in your PQR?
Topics
Industries




