In a 15–25 °C pharma warehouse, the top rack sits closest to the largest heat source in the building: the roof.
A metal roof in afternoon sun runs far hotter than the outdoor air. It radiates down onto the top pallets and heats the air beneath it, and that warm layer stays up there. Cooling supplied at low level mixes the aisles and leaves the layer under the roof largely alone.
In rough order of what we would do first:
- A reflective roof surface. Solar gain is turned away before it becomes heat, and on a new build it costs little more than the standard finish.
- Insulation under the deck, continuous, with the joints taped. Gaps at the purlins and the ridge let heat straight back in.
- Return or extract air taken at high level, so the AHU pulls the hottest air away from the top pallets instead of leaving it to sit.
- Destratification fans, used with care. They push the warm layer down and even out temperatures, which helps a mapping study, but every fan adds its motor heat to the cooling load.
None of this replaces active cooling. In Viet Nam's climate a warehouse held at 15–25 °C needs it, and the roof decides how hard that cooling has to work. In our load calculations the roof build-up is an input like any other, so a cheaper roof shows up as a bigger chiller.
Which of these did your warehouse get: all four, or only the chiller?