Skip to content

Life Sciences

Purified Water: 5.1 or 1.3 µS/cm?

  • Life Sciences
  • 1 min read

Ph. Eur. Purified Water passes at 5.1 µS/cm; USP Purified Water fails its first-stage conductivity test above 1.3 µS/cm.

Same name, and one limit is about four times tighter. Both figures are at 25 °C. On TOC the two pharmacopoeias agree, at 0.5 mg/L and 500 ppb, which is the same limit in different units. Conductivity is where they part.

A water system designed and qualified for the European limit can run for years at 2 or 3 µS/cm and never raise an alarm. Then the company decides to file in the US, and each of those results fails stage 1 of USP <645>. Stages 2 and 3 of the test give some room, but the RO and EDI stages cannot be redesigned overnight, and years of historical data do not support the new claim.

Designing for 1.3 µS/cm from the start usually costs less than people expect, provided the pre-treatment, membranes and polishing are sized for it at design stage. It does change the online conductivity alert and action limits, the sampling plan and the performance qualification, so it has to be settled before those are written.

That is why the destination market belongs in the design basis on day one: the conductivity the RO and EDI stages are designed to reach depends on it.

Humiley designs PW, WFI and Pure Steam systems as part of its clean utilities scope.

Industries

Related

More on this subject

The CCS is where design decisions get defended

Under EU GMP Annex 1 (2022), the Contamination Control Strategy has to connect barriers, airflow, personnel and material flows, cleaning, utilities and monitoring. A useful test for any CCS: every line should point to a drawing, calculation or test, not to a procedure written after construction.

Read

Recovery test or clean-up period in the URS

The ISO 14644-3 recovery test times a 100:1 fall in particle concentration after an aerosol challenge and measures the air system. The Annex 1 clean-up period, under 20 minutes as a guidance value and set during qualification, describes the room after real operations. Write the recovery test into the URS and set the clean-up period at in-operation qualification.

InsightRead