Rouge on a WFI loop is a symptom. Its ASME BPE class tells you where it came from, and the source decides whether you derouge or redesign.
Class I is migratory. It forms somewhere else, often at a pump impeller or in a heat exchanger, and travels with the water as particulate that settles downstream. It is orange to red-brown and usually wipes off. Derouging the whole loop without dealing with the source buys time, not a fix.
Class II forms in place. It is often linked to chlorides or other halides attacking the passive layer, and it sits tighter on the surface, darker and harder to wipe. The question here is where the halides come from: feed water, a cleaning agent, a weld that was never properly passivated. Fix that first, then derouge and repassivate.
Class III is the black oxide of hot systems, usually pure steam. It is a stable magnetite layer, hard to remove and quick to come back. Many owners trend it and inspect it rather than strip it on a schedule.
A white cloth for a wipe test, a borescope where the loop allows, and a map of where the rouge is worst will usually separate the three before a sample goes to a lab.