Who may change the clock on a GMP computer

  • Life Sciences
  • 1 min read

If an operator can change the Windows clock on an HMI, every timestamp that HMI writes can be argued with.

21 CFR 11.10(e) asks for secure, computer-generated, time-stamped audit trails of operator entries and actions. You can configure that audit trail perfectly and it is still worth little if the time it records comes from a clock anyone can adjust. Set the PC back an hour, repeat a step, set it forward again, and the record looks clean.

PIC/S PI 041-1 expects date and time settings to be controlled and restricted. On the systems we review, that comes down to three checks:

  1. Only administrators can change date, time and time zone. The right is removed from the operator role in the operating system, not just hidden in the application.
  2. The clock synchronizes to a reliable source, usually the site NTP server, and a failed sync raises an alarm.
  3. Any change to the clock is itself logged, with who made it.

The weak spot is rarely the SCADA package. It is the workstation beside the line that was set up years ago with a shared local admin account because that was quicker.

When we write the URS for automation to Part 11 and Annex 11, clock control sits in the security section, and OQ includes a test that tries to change the time from an operator login.

Who holds the right to change the time on your production PCs today?

Industries

Related

More on this subject

GAMP 5 Second Edition puts critical thinking first

GAMP 5 Second Edition (2022) scales validation effort to risk to patient safety, product quality and data integrity, and adds agile and cloud guidance. On a GMP BMS, test alarms, audit trail and data transfer deeply. A quick check: count low-risk functions that still carry full test scripts.

InsightRead

GMP on the electrical side

Where a SCADA, BMS or EMS records GMP-relevant data, access control, clock synchronization, alarm records and audit trails are decided by the electrical and automation engineers. Many sites keep those parameters on a separate validated EMS. Humiley's cross-functional training covers GMP, validation and project management.

InsightRead

Servers, network, virtualisation, backup and time sync under a GMP system are qualified as a controlled platform; the application on top is validated for its intended use. With the platform qualified, a routine OS patch needs an impact assessment and a targeted check, not a new OQ of the SCADA.

InsightRead