Wet table salt in a sealed pot holds the air above it at about 75% RH, and it barely cares about the temperature.
A saturated salt solution, with undissolved crystals in it, fixes the humidity of the air sealed above it. For sodium chloride that is about 75% RH at 25 °C, and it hardly moves between 20 and 30 °C. For magnesium chloride it is about 33% RH. The values come from published fixed-point tables, and ASTM E104 describes the practice.
That gives a two-point check for a humidity probe between calibrations. Make a slurry of wet salt with visible crystals in a small lidded container, seal the probe in above it without touching the salt, and leave it for several hours at a steady temperature. Read it against 75%, then repeat with magnesium chloride against 33%.
A probe that reads 71% and 33% has a slope error. One that reads 71% and 29% has an offset of 4 points, twice the ±2% RH that the desiccant systems we supply control to.
Kitchen salt has additives, so use laboratory-grade salt, and a leaking lid or a drifting temperature moves the fixed point. It is a field check: it does not replace a traceable calibration, and we would not adjust a GMP sensor on it.
Topics
Industries




