Skip to content

Newsroom

News & Insights

Company news from Humiley Group INC and technical notes on cleanroom HVAC, GMP validation, semiconductor environments and energy-storage engineering.

  • 780 articles

Life Sciences

Life Sciences

49 articles tagged #Manufacturing.

What ends the life of a HEPA filter

EU GMP Annex 1 (2022) asks for an integrity test of final filters at requalification and puts no age on the filter. A terminal HEPA is replaced when a leak cannot be repaired within site limits, when pressure drop reaches the manufacturer's final value, or after damage or wetting. On glass-fibre media, dust loading alone does not lower efficiency.

InsightRead

Decommissioning a room or HVAC system under change control

A room taken out of use without paperwork keeps alarming and keeps printing maintenance tasks. Treat it as a change: assess the neighbouring pressures, archive the final records and monitoring data, isolate utilities and cap ducts, update the asset register, maintenance plan and calibration schedule, and formally retire the monitoring points.

InsightRead

Zoning and Pressure Cascade

In pharmaceutical facility design, if the HVAC system is the "lungs," then the Zoning and Pressure Cascade strategy is the "immune system." It creates invisible but effective barriers that prevent microbial ingress and strictly control…

InsightRead